VIDEO UPDATE: Our Launch Party was AMAZING! It was so much fun to see so many of our friends and such a blessing to us to be sent off. Maverick was a little partied out afterwards, he was falling asleep while we ate dinner.

PROJECT UPDATES:

  • Solar is on the roof! It’s not quite finished, but it’s super close.
  • Lia put locks on all the cabinet doors for while we drive.
  • New business cards arrived!
  • New Yard sign arrived!
  • Water pump installed
  • Pressure tank installed

WHAT’S LEFT:

  • Install propane furnace (as a backup)
  • Wire in solar panels
  • Plumb in new water pump
  • Replace cracked coolant hoses
  • Install air horn
  • Fix bathtub
  • Cut hatch to the bombay

PRAYER REQUEST: We need prayer for this last push before we leave. We are tired, and emotional. It’s been hitting us how different life will be, and we want to navigate that well, as a family. That we would be adaptable.